Welcome to another episode of ASX Briefs, and joining me today is Simon Noon, the Managing Director of Boab Metals Limited, a company that has a solid history in exploration of gold, copper, zinc, lead and silver and is currently 100% focused on its development of its flagship Sorby Hills project in the Kimberley region of Western Australia, and today we'll discuss the recent developments and prospects of their mining projects. Simon, thanks for joining me today and welcome to the podcast.
Simon Noon Guest
00:29
Hi Andrew. Yeah, pleasure, Great to join you.
Andrew Musgrave Host
00:32
Okay, can we start by giving an overview of Boab Metals and the main focus of the Sorby Hills project.
Simon Noon Guest
00:38
Sure, sure, yeah. Look Boab Metals, listed on the ASX, ASX code BML. It's a company that I've been running now for over a decade, so 2013. I took over here. We've got a long, long history of working through various metals and having success, but certainly the last five to six years has been very much focused on the Sorby Hills project and the development of that asset. Today we sit around a market cap of around 30 mil and, just given now the advanced nature of the project, we're poised for some serious growth, I think, over the next 12 to 18 months.
Andrew Musgrave Host
01:16
Okay, and what makes the Sorby Hills project a significant development, not only for the company but for the mining sector in the Kimberley region?
Simon Noon Guest
01:25
Oh look, I think we're obviously in the best jurisdiction, arguably in the world for building a mining project.
01:32
The East Kimberley is a great part of the world to work and with this particular project it's quite different because it's very close to town, so it's a 35-minute drive, so about 50 kilometres out of the major town of Kununurra, which I think today has got a population of around 7,500 people and a lot of businesses there that have been developed and grown over the years supporting the Argyle Diamond Mine, which of course now is in rehabilitation, and so there's a great opportunity there for local business, very much a drive in, drive out opportunity as well when we get this thing built.
02:12
So very exciting for the region. We've obviously seen a number of mining projects in that region that have fallen short on the back of particularly Panoramic with, obviously, the decline in nickel, um, so it's a really important project for the region and uh and we get, we get great support from the community up there.
Andrew Musgrave Host
02:44
And the company has recently completed the Front-End Engineering Design (FEED) study for Sorby Hills, which delivered a pre-tax NPV of A$411 million and an internal rate of return of 37%, so can you walk us through the key findings of this study and the enhancements made since the DFS?
Simon Noon Guest
02:51
Yeah, sure, look. Firstly, I'd point out, those metrics that you've just presented were long-term pricing. At today's FX rate and metals prices it's significantly stronger than that but certainly stands up very well at that long-term pricing. So in early 2023 we delivered the full feasibility study to the market. We opted, given the high inflation environment that we were in at the time, we opted to go to tender with the major contract, so that was an EPC for the process plant and the full mining contract.
03:30
Now we went to tender in the December 2022 quarter and, as some of your listeners might remember, that was really the height of inflation. And so what we recognised when we did that study was that there was some opportunity there to create a bit more of a competitive environment in that tender by sort of doing it a bit later on, when inflation sort of calming down and we've started to see that now. Clearly we've seen a few operations closed, a lot more availability for labour and contractors looking for jobs. So that was the main driver. We saw some opportunities in the mining schedule, essentially on the back of discussions with lenders post the DFS. They sort of said look, you know cash flows are great, but they're a little bit lumpy here. Can you smooth those out a bit?
04:27
So we adjusted the mining schedule, brought a bit more higher grade material to the front end of the mining schedule. We opted for then a traditional tailings facility rather than sort of in-pit tailings, which was sort of costing us a little bit in cash flows mining out a lower-grade deposit early in the mining schedule. So we sort of let the optimiser do what it naturally wanted to do and, of course, source the best material early in the schedule. So we saw all that come through, we worked through those opportunities and we at the same time pressed go on the detailed design with Gres, and so they completed that work. So we sort of we packaged all that up in what we called the feed study and, as you said, certainly improved economics made the project stand up even better. But at the same time, you know we released that in June this year. At the same time, what we've done there is refreshed all those numbers, and I think that's important in this environment because people lose confidence pretty quickly.
05:27
On pricing, you know, is that pricing right today? Yes, it was right last week. Is it right this week? So you know, the EPC largely came out at around the same cost. But there was a significant saving in the mining package and that was largely driven by the more competitive nature of actually the bidding.
Andrew Musgrave Host
05:49
And with that feed study now complete and obviously making significant improvements on the project's economics, what are the next steps towards the final investment decision?
Simon Noon Guest
06:07
Next steps is offtake. We ran a competitive process for the lead silver concentrate that we'll produce. We're fortunate in that the actual product that we'll produce is a really, really clean concentrate. So of course all the major offtake partners and traders are keen to secure that. And so we ran that process. We got to an advanced stage and we sort of picked the three better ones and we sort of said, right, let's just park those offtake terms now. Now tell us what you can do to help us get this mine built. And so we're in advanced negotiations as far as offtake. And, as we've sort of outlined to the market, we're very hopeful that that offtake package will encapsulate some financing with it.
Andrew Musgrave Host
06:52
Okay, and the recent Phase VIII drilling program at Sorby Hills successfully identified new mineralisation, so can you share some more details on the significance of this discovery and what it means for the overall resource potential?
Simon Noon Guest
07:05
Yes, yeah, look very exciting. The exploration team certainly got very excited last year At the end of the program last year we had a really efficient program and we had some money left in the budget, and so we drilled what was, you know, in all honesty, a very high risk exploration hole at the end of the program. It was two kilometers away from the Sorby Hills reserves and essentially was put together. It was a seismic target and we used some very, very old seismic data that we'd acquired to generate this target. We put the one single hole in. It was at depth.
07:38
Essentially, what we were looking for was feeders for the Sorby Hills mineralization and look, we hit nearly 10 meters of economic mineralization. What was really interesting is the amount of zinc. At Sorby we tend to expect around sort of for every 10 parts lead you'll get one part zinc, so not a great deal of zinc. In this particular hole, we were seeing as much zinc as we were lead, and so really really quite exciting about what we might have discovered there.
08:09
This year we've, then, followed up with just a very short program. We're very focused on looking after the funds we've got and making sure it gets us to FID, so we did what was very. You know this was a four-hole program and we've essentially tested up-dip and down-dip to that hole that we hit last year and look, by all accounts we've encountered very similar mineralisation and so really what that tells us is that this area warrants an extensive drill program. You know I don't have the funding in the bank at the moment to be able to go and do that, but you know it bodes very well for potential mine life extension in the future and potentially going underground and obviously securing a lot more zinc.
Andrew Musgrave Host
08:58
And you've had a big announcement this week with the, you've secured an option to acquire Henan Yuguang's 25% stake in that project, which is very exciting. So can you tell us about how that agreement has come about?
Simon Noon Guest
09:11
Yeah, sure, sure. Look, this has been in the making for quite some time. I've made no secret of the fact that I have wanted to acquire 100% of this project. Look, discussions with lenders sort of made it quite clear that the complex structure of an unincorporated joint venture wasn't ideal. And you know, lenders in this kind of environment are really looking for 100% security and ideally, you know, sort of clean ownership structure. You know, we were never told that. You know we're clearly talking to government agencies as far as loans go as well.
09:52
And you know look it's been made clear by a number of banks that you know, whilst they're not saying no to potentially providing debt to the company for the project, they're clearly making it obvious that it would be more likely and easier to do so with 100% ownership of the project. And so, look, we've got a really strong relationship with Henan Yuguang. We've worked very closely with them over the last six years. They've been a great partner and you can, if you sort of look at the structure of the deal, you can. You know that comes through. You know, I mean, there's no money changing hands in the early days. It's an opportunity for us to to acquire that 100% of the project at fid. And so, in effect, you know the the funds used to acquire the additional interest will come from your overall financing package, and so it's a great outcome for for Boab shareholders and I think you know paves the way for a much easier process when dealing with lenders.
Andrew Musgrave Host
11:00
Okay, now just looking beyond Sorby Hills. I know you've got some impressive silver deposits as well. Can you give us an update on where that's all at?
Simon Noon Guest
11:08
Yeah, look, I'm glad you touched on that, Andrew. I mean, the Sorby Hills deposit actually has 53 million ounces of silver. So you know, depending on the price that you use for your economics today, that's around 25% to 30% of the revenue that that silver will generate. But in all honesty, you know, just by itself, even putting the base metal aside and just looking at the silver, that's one of Australia's largest silver deposits. So it's very important. It's a very, very exciting market at the moment for silver.
11:46
You know, some of the predictions are quite exciting on where that might go and we certainly like where it's heading. And in all reality, what the Sorby Hills project represents is, I think, low-risk exposure to silver. You know, we know silver is a volatile metal. You know it has some big movements both ways in price. But in Sorby we have a stable base metal that sort of pays the bills, if you like, and effectively we've got a margin that is fully exposed to the silver price, which is quite exciting. And obviously, given the advanced nature of Sorby Hills, with many of its permits in place, fully defined resource, lots of proven reserves, et cetera, et cetera, it. You know, the likelihood is that this will actually be the next project to actually produce silver in this country, so very excited by the silver potential and the opportunity we've got in front of us.
Andrew Musgrave Host
12:52
Okay, and just to wrap things up, what are some of the key milestones investors can look forward to in the next 12 to 18 months?
Simon Noon Guest
13:00
Look, clearly we're heading towards FID. There's still some remaining approvals that we need to get in place. There'll certainly be some key milestones along the way Offtake, as I mentioned before, which we very much expect to come with the first piece of financing and that will then allow us to then go back to lenders and say, right, this is offtakes in place. This is what we've done in the feed study. We've refined things. You know the project looks better. This is the gap. What can we do? That's really where we're at.
13:37
But yeah, look, I think there's a lot of exciting news to come for the next sort of 12 months for this company. I mean, you know we've sort of been beavering away in the background. It's. You know, none of you listeners will be surprised to hear that it's been pretty tough at this end of the market. But what we've got here is an asset that is well advanced, hugely undervalued in best jurisdiction in the world. We're close to port. We're just 140km down the road from Wyndham Port. It's very straightforward processing. You know it's a simple flotation plant. You know everything's sort of in its favour. You know it's very shallow, I mean the deposit. You're into economic ore 20 metres from the surface. So it's an attractive project and when the market gets going, you know these are the projects that will be first into production.
Andrew Musgrave Host
14:29
Okay, Simon. Well, it's been great to get an update on the company. Thanks for your time today and we look forward to further updates in the upcoming months.
Simon Noon Guest
14:37
Absolute pleasure. Thanks for having me on.
Andrew Musgrave Host
14:41
That concludes this episode of ASX Briefs. Don't forget to subscribe and we look forward to catching you on our next episode.
00:00 / 14:52